Get DEWA approvals with the help of our expert consultants to ensure your project meets all electricity and water regulations in Dubai. Whether you are setting up a residential, commercial, or industrial facility, compliance with DEWA standards is mandatory.
DEWA approval is an official clearance issued by Dubai Electricity and Water Authority. It confirms that your proposed electrical or water works are following the DEWA Authority regulations and technical standards.
You may need DEWA approval for:
Without DEWA approval, any kind of power connection or modification will not be allowed.
DEWA Application Approval service is commonly required by:
If your project involves any change to electrical load, panels, wiring, or water supply, DEWA approval is mandatory.
If you have any questions, please feel free to call, WhatsApp, or email.
Different projects require different types of DEWA approvals. We help identify the exact approval needed so you don’t apply for the wrong service.
DEWA Fit-Out Approval (NOC)
Required for interior works in commercial or residential units. This includes lighting changes, socket additions, HVAC power, and layout changes.
New Electricity or Water Connection
For new units, new buildings, or first-time connections where no active meter exists.
Additional Load Approval
Needed when existing electrical capacity is not enough for new equipment, kitchens, machinery, or added HVAC load.
Meter Installation or Upgrade
Required when installing a new meter or changing meter capacity.
Temporary Power Connection
Often required for fit-out works or construction activities before final handover.
We follow a clear, step-by-step process that aligns with DEWA requirements and authority portals.
1. Initial Review and Scope Check
We start by reviewing your project details, location, and purpose of approval. This helps confirm the exact DEWA service required and avoid incorrect submissions.
2. Document and Drawing Preparation
Our technical team prepares or reviews all required drawings and documents according to DEWA standards to avoid rejection.
3. Online Submission to DEWA
We submit the application through the official DEWA system and ensure all fields, uploads, and declarations are correct.
4. Authority Review and Responses
If DEWA raises comments, we respond, revise drawings if required, and resubmit until approval is granted.
5. Final Approval and Clearance
Once approved, we share the official DEWA NOC or approval letter and guide you on the next steps such as inspection, meter work, or activation.
Requirements can vary based on project type, but most DEWA applications need the following.
General Documents
Technical Drawings
Additional Documents (If Applicable)
We clearly guide you on who provides each document so there is no confusion.
Approval Dubai team helps clients get DEWA approvals by handling the entire process from start to finish in a clear and practical way. They review the project requirements, identify the correct type of DEWA approval needed, prepare or check all technical drawings, and make sure every document meets DEWA guidelines before submission. The team submits the application through the official DEWA system, responds to authority comments, revises drawings when required, and follows up until approval is issued. By managing communication, technical details, and timelines, they reduce delays and help clients move forward with power connection or fit-out work without delays or unnecessary revisions.
Can I apply for DEWA approval myself?
No, only DEWA-certified contractors can submit applications. We handle the entire process on your behalf.
How much does DEWA approval cost?
Costs vary depending on the type of project and electrical load requirements. Contact us for a personalized quote.
What is the DEWA NOC?
The No Objection Certificate (NOC) is issued by DEWA after reviewing and approving your technical documents. It is required before installing electricity meters or making modifications.
Does DEWA inspect the property before approval?
Yes, DEWA may conduct site inspections to ensure that electrical and water systems comply with safety standards.
How can I track my DEWA approval status?
You can track the approval status on DEWA’s online portal, and our team also keeps you updated throughout the process.
If you have any questions, please feel free to call, WhatsApp, or email.
Don’t let approval delays slow down your project. Whether you need a new connection, upgrade, or compliance check, we are here to help.
📞 Call Us: +971 56 199 8031
📧 Email: info@ueaconsultancy.com
Approval Dubai Team has years of working experience with authorities, delivering best services for all kinds of authority approvals in Dubai. We have a team of highly experienced professionals, having huge experience in dubai authority approvals. All our team members are well trained and always aware of all industry updates on a regular basis.
09:00 Am - 11:00 Pm
© 2025, All Rights Reserved. Developed by Netmark SEO.